The Sewerage of Sea Coast Towns

Chapter 10 THE DESIGN OF SEE OUTFALLS.

Word Count: 1654    |    Released on: 06/12/2017

if any part of the structure is to be constructed above the level of the shore, whether it is likely to be subject to serious attack by waves in times of heavy gales. If there

obably be found in the trench. Pipes having plain turned and bored joints are liable to be displaced if exposed to the action of the waves, but if such joints are also flanged, as Fig. 24, or provided with lugs, as Fig. 23, great rigidity is obtained when they are bolted up; in addition to which the joints are easily made watertight. When a flange is formed all round the joint, it is necessary, in order that its thickness may be kept within reasonable limits, to provide bolts at frequent intervals. A gusset piece to stiffen

l.-Stoneware Pipe and

action of sea water better than steel, but they add considerably to the cost of the outfall sewer, and the principal advantage appears to be that they are possibly easier to remove than iron or steel ones would be if at any time it was required to take out any pipe which may have been accidentally broken. On the other hand, there is a liability of severe corro

-Spigot and Socket Join

. 23.-Lug Joint fo

rned, Board, and Flanged J

h being excavated at one time, which must be well timbered to prevent the sides falling in On the other hand, cast iron pipes are more liable to fracture by heavy stones being thrown upon them by the waves, but this is a contingency which does not frequently occur in practice. According to Trautwine, the cast iron for pipes to resist sea water should be close-grained, hard, white metal. In

pipes, were fastened to the anchors. This construction would not be suitable below low-water mark. Fig. 26 represents the Aberdeen sea outfall, consisting of cast iron pipes 7 ft in diameter, which are embedded in a heavy concrete breakwater 24 ft in width, except at the extreme end, where it is 30 ft wide. The 4 in wrought iron rods are only used to the last few pipes, which we

t the sides of the excavation, and was left in when the concrete was laid. Light steel rails were laid under the sewer, in continuous lengths, on steel sleepers and to 2 ft gauge.

te 1: P

in Fig. 29, it is generally difficult to drive the piles with such accuracy that the bearers may be easily bolted up through the holes provided in the piles, and, if the holes are not drilled in the piles until after they are driven to their final position, considerable time is occupied, and perhaps a tide lost in the attempt to drill them below water. There is also t

to one pair of the legs lifted and lowered the pile, through a block and tackle. When the pile was ready to be sunk, a 2 in iron pipe was let down the centre, and coupled to a force-pump by means of a hose; a jet of water was then forced down this pipe, driving the sand and silt away from below the pile. The pile was then rotated backwards and forwards about a quarter of a turn, by men pulling on the arms; the pile, of course, sank by its own weight, the wa

ration:

BERDEEN SEA OUTFALL

Fig. 29-CAST IRON PI

WATERLOO (LIVERPO

ce pag

is boulder clay or similar material, the best results will p